top of page
AgriBio-building-night-reflection-key.jp

Metalwork Pneumatic

logo-mw-rgb.jpg
Picture2.png

5 Days

Picture1.jpg

Pack & Unpack

900 Lineal Metres

bays.png

81 Bays

This project required the installation of long span shelving and a full mezzanine.
TRC were also required to pack, relocate, and unpack spare parts and picking stock, heavy workshop machinery, pallet racking, dispatch and office areas.

bottom of page